Mizton Wellhead Platform

Recommend
Share
Tagged in
Client:
ENI Mexico / State Service
Location:
Offshore Mexico-Bay of Campeche
Date:
February 2019
Services Provided:
EPC: Detailed Engineering, Procurement
Project Details:
  • MIZTON is the first platform installed offshore Mexico by an IOC
  • The MIZTON WHP Platform:
    • Unmanned Satellite Production Facility
    • 106’ W.D.
    • Conventional Piled, 4-Leg Platform
    • 12 conductors
    • 75,000 BLPD
    • 60,000 BOPD
    • 54 MMSCFD
    • Three Primary Deck Levels
    • Boat Landing
    • Emergency Quarters
  • The Main deck is designed to accommodate coiled tubing unit
  • The Cellar deck is designed for the production equipment.
  • Export Pipeline 10” to an onshore separation facility
  • Phase 2 production will flow to FPSO
  • Contract signing to loadout was 13 months